Design and Implementation of Gynecological Surgery department

Design and Implementation of Gynecological Surgery department

Completed Projects
More than 2,000,000 square meters in the form of LSF light structures on the roof - including 38 beds
Category:
Design and Implementation
Location:
Tehran
Year:
2014
Project owner:
Khatam Hospital

Design and implementation of gynecology and obstetrics and gynecology hospital

The Department of Gynecology, Obstetrics and Gynecology of Khatam Hospital is located on the south roof of the main and old building of the hospital. The skeleton and its execution method was in accordance with section 14, and like section 14, due to the high thickness of the roof (about 40 cm in some places) and also the numerous equipment on the roof, first the additional parts on the roof were cut up to the concrete of the roof and After cutting, the equipment on the roof was transferred to the truss.
In order to reduce the costs, first the electrical and mechanical facilities of the building were examined and after making changes and updating in some places, the existing infrastructure of electrical and mechanical facilities was used to equip this section.
It should be mentioned that all the demolition and cutting operations on the roof, relocation of existing facilities on the roof, concreting and strengthening of the roof on the roof, implementation of the skeleton of the LSF light structure along with the sandwich panel roof, implementation of electrical and mechanical installations, as well as carpentry and The delivery of the project has been implemented in the conditions that all the departments of the hospital were in operation. Due to the location of the CCU3 section and the sensitivity of this section, this section was closed during some of the execution times of section 15.