Dental Clinic of Melli bank hospital
Dental Clinic of Melli bank hospital
Completed Projects
Category:
Design and ImplementationLocation:
TehranYear:
2015Project owner:
Melli BankDental Clinic of Melli Bank Hospital
The design, consultation and construction of the dental clinic of the Bank Melli Hospital was carried out by Zaref Ista Engineering and Technology Company. Considering the establishment of the dental building of National Bank Melli Hospital outside the hospital and the need to centralize all departments inside the National Bank Melli Hospital, for this purpose, after examining the condition of the building of National Bank Melli Hospital, the best place was chosen for the location of the dental clinic. After selecting the desired location, the plans of the dental clinic were designed by the design department of Zaref Ista Engineering and Technical Company, and after the approval of the plans, they were referred to the construction department of the technical and engineering company for implementation.
The dental clinic of National Bank Hospital has 550 square meters under the building. This building has 9 dental units and all the rooms needed for a well-equipped and up-to-date dental clinic are available in this clinic.
The executive operations of the dental clinic of the Bank Melli Hospital began in March of 2014, and by the end of the Eid holiday of 2015, the operations of the foundation, skeleton, porcelain blade, mechanical installations, electrical installations, building facade, and tiling were completed, and the rest of the executive operations were completed by the end of the year. It will end in April 2015.